Blast rocks, drill tunnels and force your way through every mountain. At the beginning you have enough time and no major problems. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade.
27 Comments - Last post 1 hour ago by icaio
318 Comments - Last post 2 hours ago by CelticBatman
210 Comments - Last post 3 hours ago by LinustheBold
557 Comments - Last post 4 hours ago by jiggakills
15,423 Comments - Last post 6 hours ago by GeoSol
44 Comments - Last post 7 hours ago by ColdOut
1,163 Comments - Last post 8 hours ago by magicmase
12 Comments - Last post 3 minutes ago by Lugum
106 Comments - Last post 18 minutes ago by AmanoTC
210 Comments - Last post 42 minutes ago by amst4d
56 Comments - Last post 44 minutes ago by TrevorGoodchild
42 Comments - Last post 51 minutes ago by UnbakedBacon
276 Comments - Last post 1 hour ago by Clerius
173 Comments - Last post 1 hour ago by insideAfireball
Thank You
Comment has been collapsed.
se ve interesante gracias
Comment has been collapsed.
Hell yes i amma mine my way to hell now
Comment has been collapsed.