Blast rocks, drill tunnels and force your way through every mountain. At the beginning you have enough time and no major problems. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade.
That’s how you’ll create the building site piece by piece before starting the tunnel itself. You’ll need to pay attention to many factors. The tunnel drilling machine has to be kept supplied with building materials. It’s important that you don’t lose track of your tasks. Frequent visits to your control room will be crucial.
28 Comments - Last post 2 seconds ago by Nalgasaki
46,857 Comments - Last post 29 minutes ago by MeguminShiro
462 Comments - Last post 30 minutes ago by MeguminShiro
25 Comments - Last post 51 minutes ago by madsession
47 Comments - Last post 1 hour ago by TacoTues
1,443 Comments - Last post 1 hour ago by UltraMaster
22 Comments - Last post 1 hour ago by Nocolicious
225 Comments - Last post 36 seconds ago by MikBok117
85 Comments - Last post 11 minutes ago by DrPower
74 Comments - Last post 17 minutes ago by Swordoffury
15,208 Comments - Last post 24 minutes ago by adam1224
2,741 Comments - Last post 28 minutes ago by KPopPoyehavshiy
124 Comments - Last post 43 minutes ago by LaVolpe99
26,594 Comments - Last post 53 minutes ago by softbearcas
Thanks! (◕‿◕)
Comment has been collapsed.
Thanks for a chance! ;)
Comment has been collapsed.
Thanks! (◕‿◕✿)
Comment has been collapsed.