Blast rocks, drill tunnels and force your way through every mountain. At the beginning you have enough time and no major problems. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade.
That’s how you’ll create the building site piece by piece before starting the tunnel itself. You’ll need to pay attention to many factors. The tunnel drilling machine has to be kept supplied with building materials. It’s important that you don’t lose track of your tasks. Frequent visits to your control room will be crucial.
0 Comments - Created 3 minutes ago by Chris76de
4 Comments - Last post 4 minutes ago by MikeWithAnI
16,867 Comments - Last post 11 minutes ago by Zolivv
3 Comments - Last post 14 minutes ago by AnonymousBroccoli
2,671 Comments - Last post 18 minutes ago by MeguminShiro
21 Comments - Last post 50 minutes ago by pb1
16 Comments - Last post 57 minutes ago by Carenard
43 Comments - Last post 1 minute ago by TheMuzo
50 Comments - Last post 6 minutes ago by Warriot
17,623 Comments - Last post 10 minutes ago by Warriot
8,628 Comments - Last post 19 minutes ago by gortman
97 Comments - Last post 27 minutes ago by VernoWhitney
78 Comments - Last post 31 minutes ago by Littleone24
3,960 Comments - Last post 35 minutes ago by pizurk
Thanks! (◕‿◕)
Comment has been collapsed.
Thanks for a chance! ;)
Comment has been collapsed.
Thanks! (◕‿◕✿)
Comment has been collapsed.